Wednesday, July 16, 2008

Tank support cleaned up


Here's the end result....lol.... now to layout the bolt holes and to weld them to the frame.

Drill and tap the bump stop plates


After they are seal welded to the frame I will re-tap them to clean out the threads.

Seal welded the tank support


Inside and out

Fuel tank support rough out


First I cut heated and bent the wrap around leaving it long to give myself some play. Then I roughed out the lid.

Rear fuel tank support location


Here's where the tank support goes. I will have to tap the plates for the rubber bump stops and seal weld them on first as it will cover them up.

Details details details


Some of the small stuff seems to take forever. Here is a pic of the rear fuel tank support. It is the small square protruding "box" with the two holes in it.

Thursday, July 10, 2008

More quality parts from Silver Eagle Bus in Texas


And Silver Eagle Bus comes thru again. These are the four new shackle mounts that weld into the bus frame. They left the tops loose (tacked on) so that I could seal weld them inside and out. And you thought I was kidding when I said it all had to go.....lol..........

More quality parts from Silver Eagle Bus in Texas


Here is one pair of two of the boggie mounting plates for the frame. These will weld into the bus under the fuel tank areas. They are laser cut out of 1/4 inch plate steel. Super quality piece here boys. I was impressed with the cut on these. The other pair is already clamped to the bus ...lol.....

Floor joist in the bus floor


I now have all the floor joist in the bus now. Here I have just about completed welding in the 1/8 inch thick straping along the outside walls. I allso am seal welding one along the ceiling of the wheel wells to seal out the water and hopefully help curb the rust intrusion again.

New floor joist for the baggage bay floors


They are all in now. Later I will frame in the openings for the propane tank vent hole and for electrical, fresh and waste water openings that need to go thru the floor. I have worked out a way to power out my waste pipe by just hitting a rocker switch like the Marathon guys have. I will fill you in on it later.

Tuesday, July 8, 2008

11 gauge rear engine wall


Here,s a good shot of the new 1/8 inch thick wall form for the rear wall. Later I think it will end up with polished stainless over it. I am looking forward to getting the Rust Bullet on it before it starts to get the rust scale on it.

Friday, June 27, 2008

The jig vault ....lol......


Paul, heres where the measurements come from....lol....

Wednesday, June 25, 2008

Engine compartment looking forward



This sure is a drastic change from the earlier post this week.

More new steel


It seems to be moving alot faster now that I don't have to cut out old rusty steel to make way for the new. I have quite a bit of new steel left to weld in yet but I do see light at the end of the tunnel now!!!!

New steel


Here's the new cross members and new parallel members welded into the bus.

Two to tie two together...lol...


These two will tie the last two cross members together in the bus.

New passenger side fuel tank support


Also is the framework for the boggie torsion spring there in the hole.

last two cross members (better pic)


One cleaned up and one not.

Here is a couple of new cross members in the fab state


The two of these go fore and aft of the drive axel.

Tuesday, June 24, 2008

What have you done to the bus!!!!!


I was singing Hallelujah and Debbie was asking me what had gone wrong here.....lol.....

The rust has left the bus for good!!!!!!!!!


That was the last of the rust damaged metal to be removed. Anything in this pic left attached to the bus that is rusty looking is metal that was put in last summer and has a little rust scale on it from last winter. A wire brush on a side grinder will take it right off.

One tough Eagle...lol....

Big bertha's at it again....lol...


Here goes the last of the rust damage. which is the last of the bus to be replaced. I am glad I stopped on the slideouts as they were going to be a hinderence to replace all this steel here.

Carving up the rear of the bus.


I wonder how much more could come out??? Before she falls that is......lol....

Above the drive axel from the drivers side.

Looking up under the linkage tunnel between the drive axels.


I have dreaded cutting all this out for 1 and a half years now. It was intimidating to me because it holds up the whole rear of the bus.

No wrenches needed to remove the engine...lol....


I just cut all the members holding the cradle and let her hit the dirt.

Drive wheel


Air tank rust. (pre-repair)

From engine compartment


Looking to the front of the bus thru the tunnel for the linkages.

Rust between drive wheel and boggie