Monday, May 28, 2007

The bus is getting bigger!!!!


wow what a diff

another angle of the curbside slideout


It is amazing what a difference the 20 inches makes in the room. It will be interesting to see what an other 33 inches on the other side will do for this room.

curbside slideout


If you look closely you can see I raised the floor in the middle of this slideout to accomodate permenently mounting the hearth to the floor and having it reveal itself as the slideout is extended. Otherwise we would have to trip over it in the middle of the bus while the slideout is retracted. I think it will be neat to see this feture in action.

front curbside slideout


The framework for the front passenger slideout is about completed. This slideout will house the fireplace and his and hers computor centers and desk each side of the fireplace.

Monday, May 21, 2007

Yep its all coming up


You can see where everything was down below. The primmered metal is all new. And see all that rust down there, well I need some new pics, cause its all been cut out now and replaced with new steel.

Out of the tank all clean with a little douse of primer for rust control


everything here is coming up 12 inches to allow for a high driver. Drivers seat same height as rest of the bus now.

This needs alittle degreasing


Into the flowover tank it goes

Friday, April 27, 2007

Drivers area


There might be a little rust here too.

column joint


this is the joint im haveing trouble getting apart

Sunday, April 22, 2007

view of the top of steps


You see that tire under there??? Yes I do have plenty of clearance, all the way to bottoming out the suspention. While under the floor, over the tire, I will form a sort of liner over the steps so as to not have them riped out from under the bus in case of a blow out. Im a big NASCAR fan and have seen first hand what tire damage can do to a vehicle. So Ill go prepared.

A view from atop


They are very comfortable to walk up and down. This I can tell from the 150 trips ive allready mad up them. I see the radious walls both covered with polished stainless steel and the risers as well. The treads Im not sure of yet but maybe marble or granite (well see what the scale registers when I get the skin back on) in the near future.

That 2 inches worked out just fine


I used the other half of the 4 inch pipe to form the center of the upper radious and filled in all around with 11 gauge steel and seal welded everything and primered for temporary rust control.

A little plating and primer


Plated with 11 gauge steel and all seal welded for water infiltration and presto.

Wheel well fill in


heres a good picture of the area filled in between the frame and hoops for support for the slide out body.

The plan


What im going to do to get that 2 inches I need is slide the upper two steps towards the passenger side of the bus 2 inches and well, remember that 4 inch pipe. BINGO 4 inch pipe = 2 inch radius = the 2 inches I need without cutting the support structure of the steering chasis.

I got a plan


I got a plan for that 2 inches while I was eating dinner. But I have to finish welding the upper two steps together first.

Still, thinking on moving or cutting that support


Hum maybe if I cut a big notch in it, weld two plates of steel over each side, turn the bus up on its side to get to it, then????? turn it on its roof then????? aw sh** I only need 2 inches. Huh, dinners ready???? Thats good I was about to turn over the bus.

Now you see the 2 inch problem too


See, I need to get one more tread in there and that *** part of the fram is just plain in the way. Hum?????????

Still working on that 2 inch problem though


I started with a 4 inch pipe, split that down its length, and used that as the pivot point and work around that as a normal spiral would.

See this junction of steel


This cant be cut without sometype of rework. and I need 2 inches of space here and cant have it. I think the picture reflects my foged up mind.

Me, still contimplating the step issues

Me, working out a plan for the steps

Wednesday, April 4, 2007

Temporary steps


I tossed the fiberglass steps to soon. I was climbing in and out without steps and about broke my neck once. So I ran down to the shop and in about 15 minutes came back with these. I will build the spiral stairs when I can take time to do it right. For now these will save the broken neck and aikin legs out a little. So if your converting like this you might not want to throw your steps away to quickly as I did.

Wheel wells


Heres one of the new "hoops" tacked in. It rained me out in the middle of the process of installing this one. Im going to put a layer of solid 1/8 sheet inside the wheel well and seal weld it all around and then flush finish with the same outside. As added protection against water entering the wheel well wall I will fill the void between the two layers of 1/8 sheet steel with expanding foam (water proof type). Mother nature willing Ill update you on this next week.

New radiused hoops for the wheel wells


I got these from Silver Eagle Manufacturing in Texas. I was surprised as they were a perfect match to the original radius. I figured they would only be close and need more attention. They changed to 1 by1 boxed as opposed to the 1 3/4 u channel which obviously just channeled the water straight into the center of the wall and promoted the rust even further.

ceiling grid


I just noticed in looking at this pic as to how much rust is gone now. After I cut those old window mullions out and put in the beam across the header all the rust will be gone from the middle of the bus. Its starting to look new again and Im not feeling so overwhelmed now.