Monday, February 17, 2014
I covered the bulkhead above the transmission with 90 thousandths aluminum and cut an access hole for my arms. the conduit was just shoved in there for storage. I have since with a hole saw cut several holes thru for various things like the conduits, power steering, heater lines to the drivers area, and air lines. I sealed each opening for exhaust fumes and water.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment