It got a little warmer last week and I got a taste of how hot it would be in the bus. It was 80 outside and probably 95 inside. So I thought I should get the high inside work done and I started and finished the ceiling grid work which is 1by1 16 gauge steel and 1/8 inch angle around the corners. Boy it was a joy to cut as it was alot faster than all the 1/8 tubing Ive been cutting and welding for the main framing of the bus. You can see part of the tray I incorporated into the living area for plexiglass and lights. There is another small one in the bedroom too.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment