Thursday, December 30, 2010
Drivers side boggie wheel well
The weather for December has sucked. Add my heart attack to that and you end up with no progress. We have had a lot more snow and ice this year than normal. Its run me inside to the shop making the new doors. I will put up some pics of them soon.
Front wall of boggie wheel well
Tuesday, November 30, 2010
Top view of boogie wheel well
Saturday, November 27, 2010
No more service hatches
Top view of floor pan around boogie axel
Wheel wells
Starting to pan the bottom of the bus
I figured I would start with the old Ac area between the fuel tanks and boggie axels. This is the bottom of the floor joist between the fuel tanks. I am covering the entire bottom of the bus so that I can put pour foam in the floors of the bays. I will be using marine foam for its resistance to water.
Large slideout on the drivers side
Im back!!!!!!!
Subscribe to:
Posts (Atom)