I will be sealing the entire floor up from the bottom other than a couple of access holes over the engine. I have will be able to access all I need from the bottom of the tunnel with various removable plates in strategic locations through out the bus.
Saturday, November 27, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment