Saturday, November 27, 2010
Starting to pan the bottom of the bus
I figured I would start with the old Ac area between the fuel tanks and boggie axels. This is the bottom of the floor joist between the fuel tanks. I am covering the entire bottom of the bus so that I can put pour foam in the floors of the bays. I will be using marine foam for its resistance to water.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment